The PALSTAT Sampling Production Part Approval Process module serves to ensure quality before serial production according to the AIAG, PPAP/VDA 2 methodologies with a possibility to store and save the measured values and to print standard protocols. The PPAP/VDA 2 process defines type requirements for the approval of products including production and material volume.
General information about PPAP / VDA 2
List of the serial production releases
Basic information on the serial production release process
Definition of control indicators and validated sizes
Record on measurements performed on the released product
Assessment and approval of products for serial production by the supplier, customer
Creation and print of protocols according to the requirements of PPAP/VDA2 methodologies.
General information of the performed presentation of a part for serial production release
Report number
Type of PPAP/VDA2 methodology
Number, name and change state
Information on the kind of presentation
Information on the customer
List of the documents presented.
Submission
Determination that the presentation level is fully in compliance with the requirements of PPAP point 1.4.1/ VDA 2 point 7.
Documentation
For a more detailed description of the sampling process it is possible to attach to the Document module, where you may enter references to electronic documents, drawing documentation, measuring machine protocols etc.
Record of the measured values
Function to record, document and save measurements of quality indicators and sizes (entered manually in the PC).
Final report and printing PPAP / VDA 2
Function to evaluate performed assessment of readiness for serial production
Printing of forms according to the requirements of PPAP, VDA 2 methodologies
Possibility to edit and modify printed outputs by the user according to customer requirements.